Discover the impact of underground mining on open pit slope walls. Learn how to identify and assess potential slope instabilities for safe and sustainable mining. Gain insights from a comprehensive parametric study on sublevel open stope …
THE TRANSITION FROM OPEN PIT TO UNDERGROUND MINING: AN UNUSUAL SLOPE FAILURE MECHANISM AT PALABORA (2006) Brummer R. K., Li H., Moss A. Go to publication link . At the Palabora Mine, the transition to caving 400 m below the bottom of the 800 m deep pit resulted in a slope failure of the North wall that began in 2003, and is still mobile. ...
Moreover, the transition from open-pit to underground mining is often required during mining operations to maximize resource exploitation and increase economic efficiency, as some deposits extend from the shallow surface to a great depth [4,5], such as the Chah-Gaz iron mine in Iran, Udachny mine in Russia and Shirengou iron mine in China .
The combined mining method of open-pit and underground caving can be divided in two ways. One is the transformation from open-pit to underground caving mining, and the other is open-pit and underground …
Open pit mining is a technique used to extract copper ore near the earth's surface. Open pit mining is the most widely used technique of mining copper today. It is accomplished by creating and using benches or terraces to gradually reach deeper under the earth's surface. Underground mining is used when the copper ore is not near the earth's ...
Open-pit mining is a type of surface mining used to extract coal, gold, and other minerals. ... One of the most significant problems in open pit mining is also endemic to …
Open-Pit Mining. Open-pit mining is a process that extracts matter close to the ground. Mining often has a reputation for going underground, but this process does not go too deep, which is why it's categorized under surface mining. However, surface doesn't necessarily mean that it doesn't go deep.
If access to a future underground mine is possible while the open pit is still operating, this can accelerate the transition to underground mining. "Early access underground, by either decline or shaft, enables …
A Strategic Approach to Open Pit to Underground Transitions for Mining Companies . The transition from open pit to underground mines is a large initiative, requiring comprehensive mine planning, risk assessments and defined objectives. This ensures progress is monitored and trackable from beginning to end of the project, which can often span ...
An increasing number of Chinese mines are transitioning from open pit to underground mining, and crown pillar design has become vital, and may eventually provide additional information to the Scaled Span concept database to provide some reference to extend the applicability of the method beyond North America. The ShiRenGou iron ore mine of ...
Based on the practice of Shirengou ore mine from open-pit to underground mining, the stabilities of boundary pillar at representative sections are calculated and analyzed by using the methods of ...
Jun 20, 2024 2:14 PM CEST. Watch 01:47. The energy transition relies on materials and minerals that are frequently mined in open pits. develops equipment for surface mining to help mine operators contribute to net zero …
Burgundy Diamond Mines (ASX: BDM), owner of the Ekati diamond mine in Canada's Northwest Territories (NWT), says it has pulled plans for underground mining at the Sable open pit following ...
Underground mining is used when an economically viable deposit is situated sufficiently deep such that open pit mining is cost prohibitive. There exist many underground …
Abstract: Due to mutual interferences between the open pit & underground mining operations during the transition period from open pit to underground mining, poor safety production and difficult production continuation occur much more frequently. Aiming at the production conditions of ore-body at the open pit bottom and hanging-wall ore-body of underground mining during …
A set of classified integer programming models for determining an optimum transition depth (OTD) between open pit and various underground mining methods is developed and it is shown that the integrated models present solutions that …
Graphite is extracted using two techniques: the open-pit method and the underground method. The economic value of the ore will determine the type of mining used. Open pit mining. Open pit mining is generally used where the ore is lying close to the earth and the layer of surface material covering the ore is thin.
Sublevel caving and open pit interaction at the Ernest Henry mine, Australia At the Ernest Henry mine, the open pit operated to 2011 and had its final dimensions of 1.5 km by 1.3 km at a 530 m depth. Sublevel caving production began after completion of the open pit with the planned cave footprint of a 220 m column (Fig. 5).
CONCLUSIONS Based on the analysis performed by using numerical program FLAC 2D for underground mining operating in the area of open pit slope, for the geological and mining conditions of Quang Ninh coal basin in Vietnam, …
Specifically, after the phosphate ore body is converted from open-pit mining to underground mining, the direct roof of the underground stope is destroyed in an "elliptical arch." When the internal stress value of the pressure …
the concurrent open pit and underground mining scenario, the optimizer prefers extracting blocks using open pit mining. This is due to the fact that although the underground mine could access ore sooner, the mining cost differential for open …
While both underground and open-pit mining is widely accepted mining processes, there is a greater inclination to further expand underground mining. This transition from open-pit to underground begins when open-pit …
Key considerations to evaluate are: open pit stability, shaft stability, dilution, mud rushes and air blasts, and mining method selection. Planning Considerations: The efficient transition from open pit mining to an underground operation requires extensive planning. For a large mining operation, planning could last as long as 20 years.
A number of large ore deposits which are mined initially by large open pit methods, also have considerable vertical extents. At some point, a decision has to be made as to whether to continue deepening a pit, or to change to low cost, high productivity underground mining, generally by caving methods. Currently, several large open pit mines are planning to make the transition to …
In order to determine transition depth from open-pit to underground mining on the basis of the allowable and economically feasible overall stripping ratios, an economic-mathematical equation is first introduced. Using the achieved equation and an analytical procedure on a particular two-dimensional hypothetical tabulate deposit, an effective ...
Simultaneous extraction of ore reserves from open pitwall and the layer immediately adjacent to the open pit bottom results in higher volume of ore discharge in the limited bottom area, besides the bottom must be stable within the adjacent layer extraction interval. The authors select the pit bottom design with two-way alternate arrangement of …
The transition from open pit to underground mining: An unusual slope failure mechanism at Palabora. In Proceedings of International Symposium on Stability of SPRING 2018, Issue 24 Rock Slopes in Open Pit Mining and Civil Engineering Situations (pp. 411-420). Cape Town: SAIMM. Castro, R. (2006).
1. The ore body is too deep to mine profitably by open pit. 2. The grades or quality of the orebody are high enough to cover costs. 3. Underground mining has a lower ground footprint than open pit mining. The underground …
A mining method that requires many benches and resembles a (roughly) circular pyramid, inverted in the earth, each successive bench being cut to a smaller radius because of the slope imposed by safety considerations. a. Underground Mining b. Glory Hole Mining c. Placer Mining d. Open Pit Mining
integrated open pit-underground mining for calculating stresses and strains in the combined massif by the proposed options is presented in Fig. 1. Fig. 1. Finite element grid with the size of the input calculation model adequate to that of the area of the integrated open pit-underground mining technology application.